Hydroelectric power plants and pumpings
Sisener engineering services
At SISENER we have been developing engineering in hydroelectric power plants since our inception.
We carry out projects ranging from the purely administrative, for processing in municipalities, communities and hydrographic confederations, through specific developments of automation, SCADA systems, regulation and control, to detailed engineering, management, supervision and commissioning.
The modernization of installations, along with the modification or execution of maneuvers and the updating of schematics, is highly sought after. In all cases, we analyze, propose, and resolve these tasks with great agility and safety.
We offer complete solutions for hydroelectric power plants, including connection / evacuation infrastructures: generation substations, switching centers and connection lines, as well as the necessary electrical studies for their processing and commissioning, both in stationary and transitory regime.